◇ 국제교육센터 환경개선 석면해체철거공사 ◇

 

 

1. 발 주 처  : 한국기술교육대학교

 

2. 시 공 사  : 휴먼산업개발(주)

 

3. 공사금액 : \ 18,954,000

 

4. 공사기간 : 2024.08.01.~2024.08.20

 

 