공사실적

◈ 탑동초등학교 교사동 개축(그린스마트 미래학교)공사 중 철거공사◈ 

 

 

1.발주자 : 충청남도당진교육지원청

 

2.시공사 : 휴먼산업개발(주)

 

3.공사기간 : 24.03.01~24.06.15

 

4.공사금액 : 179,850,000원

 